David Willson's article on Fictiv's site defines low volume as 10 to 10,000 parts and gives tooling ranges by process: none for 3D printing, about $500 to $2,000 for CNC machining, $3,000 to $15,000 for aluminum injection molds against $25,000 to $100,000 or more for hardened steel, and $50,000 to $200,000 or more for die casting. It adds that setup cost, tolerances, and secondary operations matter as much as tooling, and that cost reduction starts in design. It advises choosing a process from seven requirements and qualifying production suppliers before scaling. Fictiv sells the service the article recommends, and the figures are indicative starting points.
The window between prototype and mass production
Low volume sits between a prototype run and a production line. Tooling is the cost that decides how you cross it.
This article summarizes a piece by David Willson, published on Fictiv's site on June 26, 2026. Fictiv runs a platform that connects hardware teams to a supplier network, and the article ends by recommending that platform. Read the advice with that in mind. The tooling figures are the article's own. It calls them indicative starting points and says they depend on part complexity, size, and material.
What counts as low volume
The article puts low volume at 10 to 10,000 parts or assemblies. A prototype run is 1 to 10, and mass production is 10,000 and up. It says these lines move with the industry. A run of 500 can be high volume in aerospace or medical devices, while 5,000 can still be low volume in consumer electronics.
It compares the three stages on three points.
- Tooling investment
- Minimal for a prototype, moderate for low volume, and high for mass production.
- Speed to first part
- Fast for a prototype, moderate for low volume, and slower for mass production because of setup.
- Unit cost
- High for a prototype, moderate for low volume, and lowest for mass production.
Why teams build in this window
The article names seven reasons.
- Bridge production
- It keeps a product in the market while high volume tooling is built and qualified.
- Validation builds
- EVT, DVT, and PVT builds need units that behave like production parts.
- Market validation
- A limited run tests demand before you commit to expensive tooling.
- Faster iteration
- Lower tooling cost lets you change the design between builds without writing off a six-figure injection mold.
- Supply chain flexibility
- You can follow demand without carrying excess inventory.
- Lower capital
- Startups get more runway, and larger teams get room to run several product lines.
- Customization
- High-mix low-volume production serves many variants without a dedicated line.
What each process costs to tool
The article gives a tooling range for each process.
- 3D printing
- None. Parts come straight from digital files.
- CNC machining
- About $500 to $2,000 for fixtures and programming. No dedicated tooling is needed.
- Urethane casting
- About $500 to $1,500 per silicone mold, with no hard tooling.
- Sheet metal
- Minimal for laser cutting and press brake forming. A custom punching die adds about $500 to $3,000 where needed.
- Injection molding
- About $3,000 to $15,000 for aluminum or soft steel prototype tooling. About $25,000 to $100,000 or more for hardened steel production tooling.
- Sand casting
- About $500 to $5,000 for patterns.
- Investment casting
- About $1,000 to $10,000 for wax dies.
- Permanent mold casting
- About $2,000 to $10,000.
- Die casting
- About $50,000 to $200,000 or more. The article says the investment pays back only above roughly 10,000 units.
The gap between aluminum and hardened steel tooling is what makes low volume molding possible. Bridge molding lets deliveries start while production molds are made. For hundreds to thousands of parts, the article says molding gives consistent cosmetics and tight dimensional control.
Setup cost matters as much as tooling
Tooling is only part of the bill. The article makes two points about setup.
- CNC machining
- Spindle time is a fraction of the cost. The larger share is non-recurring engineering, meaning CAM programming, soft-jaw fixturing, and first-article inspection. As a batch grows from 10 toward 500 units, those fixed costs spread out and the per-part cost drops sharply.
- Powder-bed 3D printing
- With MJF or SLS, unit cost depends on how densely parts nest in one build volume. Dense nesting lowers material waste and cost. The article says this makes runs of 100 to 1,000 parts highly competitive with injection molding.
It also lists limits for printing. Not every method suits production use. FDM parts have strength that varies with layer direction, and large flat faces can warp or show stair-stepping if cooling is not controlled. Some materials lack the heat resistance or stability that end use needs.
Urethane casting has a limit too. Its resins usually have a lower heat deflection temperature and less strength than production thermoplastics, so it suits sales samples, market tests, and form and fit checks better than hot or heavily loaded parts.
Choosing a process
The article says to start from the requirements.
- Quantity
- Count what you need now and the 12 month projection.
- Material
- Note whether function requires a specific metal or polymer.
- Tolerances
- Tight dimensions limit the choices.
- Lead time
- Check the delivery date and how much the schedule can move.
- Tooling budget
- Set what you can spend up front, given the expected volume.
- Cosmetics
- Decide how much finish and appearance matter.
- Scalability
- Ask whether the process can grow without a redesign.
It gives three examples. Tight tolerances, metal properties, and fast delivery point to CNC machining. A plastic housing at 500 units with production cosmetics may favor rapid injection molding over urethane casting. A complex shape at very low quantity is a 3D printing candidate. The article says the answer is not always obvious, and that is where DFM guidance pays off early.
Other cost drivers
Several things shape the unit cost beyond tooling.
- Setup
- Fixturing, programming, and first-article inspection do not shrink in proportion to the quantity.
- Labor
- It is a larger share at low volume, especially with secondary operations, assembly, or manual inspection.
- Material
- Standard materials are cheaper and faster to source. Exotic alloys and specialty polymers add cost and risk.
- Secondary operations
- Anodizing, plating, painting, heat treatment, and hardware insertion can each cost more than the machining or molding.
- Tolerances
- They raise scrap, inspection, and process constraints. Looser tolerances cut unit cost where function allows.
- Logistics
- Freight costs more per unit at low volume. Fewer, consolidated shipments help.
Cost reduction starts in design
The article says cost reduction in low volume starts in design, not in negotiation.
- Design for manufacturing
- Simplify geometry, drop tight tolerances that function does not need, and design for the target process.
- Standard materials
- Common alloys and polymers across parts allow volume consolidation and faster sourcing.
- Fewer secondary operations
- Leave a finish raw where you can. Use self-clinching hardware instead of machined threaded inserts.
- Fewer suppliers
- A partner that spans several processes cuts overhead and adds pricing leverage.
- Digital workflows
- Faster quoting and DFM review give engineers time back. This is the point where the article leans on Fictiv's own offer.
Where low volume gets hard
The article lists the difficulties plainly.
- Speed against cost
- Faster lead times often carry a premium.
- Fragmented suppliers
- Managing five suppliers for one build multiplies communication risk.
- Quality consistency
- Statistical process control is less calibrated at small volume, and a first-article problem hits a larger share of the run.
- Visibility and inventory
- Small suppliers may lack order tracking, and minimum order quantities can exceed real demand.
- Qualification and scaling risk
- Each new supplier must be qualified, and a process chosen for low volume may not carry over to mass production.
For high-mix low-volume work, it adds that changing bills of materials, real-time inventory visibility, and flexible build schedules matter as much as the process. With no spare inventory to absorb a disruption, problems compound quickly.
Planning the move to full production
The article calls the move a critical inflection point. Moving too early risks quality problems and wasted cost. Waiting too long leaves market opportunity unused.
- Triggers
- Demand that stays above low volume capacity, unit economics that favor high volume tooling, and a design validated through several production builds.
- Tooling
- Moving from aluminum to hardened steel is a major capital decision. Plan it before demand forces it, and freeze the design first.
- Suppliers
- The supplier that served low volume may lack the capacity or quality systems for mass production. Qualify production suppliers during the low volume phase.
- Design control
- Control and validate design changes before scaling.
What to take from it
- Price each process by its tooling
- The range runs from none for 3D printing to $50,000 or more for die casting. Treat the figures as starting points and get quotes for your part.
- Count setup as well as tooling
- Fixed setup costs fall per part as the batch grows.
- Start from requirements
- Quantity, material, tolerance, lead time, budget, cosmetics, and scalability narrow the choice.
- Plan the exit early
- Choose processes and suppliers that will not block the move to higher volume.
- Cut cost in the drawing
- Simplify geometry, loosen tolerances, standardize materials, and reduce secondary operations.
- Weigh the source
- The article is from a company that sells the service it recommends. Check its advice against quotes from more than one supplier.
References