How to Qualify an Additively Manufactured Part for Production
We want to put a 3D printed part into production. What do we have to prove first?
Additive Manufacturing Media · John E. Barnes and Kevin T. Slattery
Published Updated
Qualifying an additively manufactured part means proving it meets its design intent, and the steps are the same in every industry. Only the depth of testing changes with the risk of the application. John Barnes and Kevin Slattery of The Barnes Global Advisors lay out a framework in three stages. Set requirements and qualify the feedstock and machine first. Then qualify the facility and the part. Then monitor production against what was qualified. In their example, a simple part cleared most steps with records and a proof test. A later change to the part or process calls for supplemental testing, not a restart.
A part that prints is not yet a part you can ship
Your team has a printed part that works on the bench. Now it has to go into a product, and someone will ask what shows that the next one matches the first. John Barnes and Kevin Slattery of The Barnes Global Advisors wrote a framework for answering that question in Additive Manufacturing magazine. This article summarizes their work and organizes it around the decisions a small engineering team has to make.
Their terms are short. Qualification means a component meets its design intent. Certification means a component that meets its design intent is fit for service in a system, and an independent authority such as a regulator grants it. Most readers will work on the qualification side, so that is the focus here.
The authors say the process is the same in every industry. What changes is how hard you test. Their worked example is a printed metal bottle opener, which keeps the steps visible.
Settle the requirements before the process
Barnes and Slattery start with requirements. The requirements of a part do not depend on how it is made. Design and analysis can differ, because printing allows shapes that were not practical before, such as lattices and topology optimized forms. A team that uses them may need new ways to analyze stress, buckling, margins of safety, and failure modes.
The authors also describe material qualification here. They call it a subset of part qualification, and it often overlaps with printing and testing. It covers how the process and the geometry change material properties, any properties that standard tests do not cover, and how much parts vary from one printer to another.
Requirements drive every later test, so write the commercial ones next to the functional ones. In the bottle opener example, the team wanted a shape that fit the palm, drew the eye, and carried a logo. That pushed them toward laser powder bed fusion. On performance, they treated failure before 1,000 openings as unacceptable. They estimated the load on a bottle cap and worked a simple failure mode calculation. That calculation informed the material choice and its thermal treatment.
Qualify the feedstock, the machine, and the facility
Feedstock and other non-print steps follow the same rules as legacy methods. The question for the qualifying organization is how deep to go. It can qualify the feedstock facility on its own merits, meaning composition, powder size distribution or wire diameter, and method of manufacture. Or it can also require evaluation of the feedstock in printed material.
The machine is different from a press. The authors note that a facility can own many printers, and the process has no tooling. For critical parts in tooled processes, qualification covers every press and die set. For the printer itself, they cite Aerospace Industries Association guidance for a three part machine qualification.
- Factory Acceptance Testing. The printer maker verifies that the printer operates properly before delivery. This gives you a known default condition.
- Installation Qualification. This runs at your site and verifies that the printer is fit to make hardware. Some call it Site Acceptance Testing. It can use a different alloy, geometry, motion, and energy level than the factory test.
- Operational Qualification. This runs at your site after installation qualification. It verifies that material from the printer meets a given specification. The team builds test coupons, applies thermal treatments, and runs nondestructive testing. The coupons then go through composition, microstructure, and mechanical tests, and the results are compared with the requirements. Each specification requirement needs its own operational qualification.
Facility qualification then needs an approved quality system such as ISO 9001 or AS9100, qualified personnel, and qualified equipment. Qualified equipment means at least one printer has passed operational qualification. This matches legacy manufacturing.
The bottle opener shows how far this can scale down. Proof of factory and installation testing, plus calibration and maintenance records, was enough for the machine. The team accepted the facility's existing aerospace qualification together with the machine qualification. The feedstock had to meet a named material specification, and the stress relief furnace had to hold its temperature. Machining, coupon testing, and nondestructive testing were not required.
Prove the part
Once the prerequisites are met, part or performance qualification starts. The team builds one or more qualification parts and checks four things.
- Process conformance. The parts follow the drawing and the process requirements, including feedstock, printing, and heat treatment.
- Part and lot acceptance. Each part passes dimensional and nondestructive checks. The lot passes composition, witness tensile, and microstructure checks.
- First article tests. The first article may need tests that production will not repeat, such as computed tomography, more dimensional measurements, and destructive testing of the part and its coupons.
- Functional tests. These range from a static proof test to multi-axial or fatigue testing, up to a subsystem or full system test.
A qualification test report then goes to the cognizant engineering organization for approval. Certification of the system and production approval follow.
The bottle opener needed far less. The parts met dimensional and surface finish requirements. No composition, tensile, or metallographic tests were required, and first article tests did not apply. Each opener in the build took a proof test at 25 degrees Celsius, and all passed.
Match the test depth to the risk
Testing intensity depends on the application and the industry. The authors give two aerospace cases. The original AeroMet process, used for F-15 and C-17 parts, took more than 3,000 coupon tests over four years. A more recent approach for laser powder bed fusion parts on the A350 and A320 used a family approach. It needed significantly less testing and covered more parts.
Those two cases show the range. Before you plan tests, decide where your part's risk puts it. A part with a low consequence of failure and a part with a high consequence do not sit at the same point on that range.
Keep watching after approval
Qualification does not end at production approval. Barnes and Slattery call for continuous monitoring so production parts stay equivalent to the qualified ones. Examples include statistical process control of key process variables, lot acceptance values, and part acceptance rate. The team should also analyze lot acceptance results statistically and compare them with the material database used to set design values. That check shows whether the process has drifted or scattered.
For the bottle opener, monitoring means tracking feedstock composition, printer output, and heat treatment cycles for conformity.
A change does not send you back to the start. The authors say a modification to a qualified part needs supplemental testing, not a new qualification from scratch.
Take-homes for your team
- Write requirements first, and include the commercial ones. They shape the process choice as well as the tests.
- Plan new analysis if the design uses lattices or optimized shapes.
- Qualify the printer. Ask for factory and installation evidence and for calibration and maintenance records. Decide whether operational qualification coupons are needed.
- Decide how deeply to evaluate feedstock.
- Set the depth of part testing from the risk of the application, not from habit.
- Treat the qualified process as the baseline, and monitor lot results against it.
- Expect a design or process change to need supplemental testing, not a restart.
The authors write mostly from aerospace and metal examples. They describe the framework as common to all engineered products. Your material and application set the specifics.
References
- Barnes, John E., and Kevin T. Slattery. A Framework for Qualifying Additively Manufactured Parts. Additive Manufacturing, Gardner Business Media, 05/26/2023.